The Maulbeerallee in Sanssouci is completely closed for concerts

Potsdam. It’s hot, the tar is melting, but there are construction works going on in the streets of Potsdam. Here are the most important restrictions on Potsdam’s main thoroughfares:

Read more after the ad

Read more after the ad

mulberry alley

During the Sansouci Maulbeerallee Music Festival between Zur Historischen Mühle / An der Orangerie and Am Drachenberg, it must be completely closed from Sunday 26 June from 1 p.m. to Monday, June 27 at During this time, bus traffic will be redirected.

Leipzig Triangle

The entrance to Friedrich-Engels-Strasse from Heinrich-Mann-Allee is completely closed from Saturday to Monday due to asphalt works on the track. Incoming traffic will be routed through the center in one lane. The detour will be signposted. The railway exchange service will be launched.

Read more after the ad

Read more after the ad

Am Brauhausberg and Leipziger Straße are still affected by the redevelopment of the Leipzig Triangle. Leipziger Strasse is a one-way street for traffic entering the city. Coming from Lange Brücke, you can re-enter Leipziger Strasse up to the garage. Brauhausberg must be designated as a one-way street between Heinrich-Mann-Allee and the Finkenweg exiting the city. Drivers from Telegrafenberg must take the detour of Brauhausberg towards the city center.

Werder railway bridge

During the construction of the new bicycle and pedestrian bridge, the entire construction site will be closed from Monday to Thursday from 6:30 to 18:00 and on Friday from 6:30 to 13:30 until the end of July. There were repeated dangerous situations on the construction site as cyclists and pedestrians did not hold onto the railings. “Illegal crossing of tracks or a railway bridge is life-threatening, hindering construction and rail traffic,” emphasizes the city administration.

Nuthestraße L40

Outside the city, Nuthestraße is reduced to one lane due to the new construction of elevated road bridges. There is a risk of traffic jams.

Read more after the ad

Read more after the ad

Behlertstrasse

Behlertstraße will be completely closed to car and bicycle traffic until the end of 2022 due to refurbishment between Berliner Straße and Kurfürstenstraße. There is a risk of traffic jams on detours.

Zeppelinstrasse

Between Kastanienallee and Schafgraben there are traffic restrictions against the Kaufland delivery access due to the construction of a new house. There is only one lane for each direction of travel.

In Buchhorst

Am Buchhorst between Handelshof and Drewitzer Straße will be closed due to the construction of district heating and drinking water networks and a detour will be signposted. Due to shaft works, there is no lane in Verkehrshof Street. A backlog is to be expected.

Read more after the ad

Read more after the ad

Sterncenter – parallel lane

Due to road works, the parallel lane of the Sterncenter is closed halfway. Accessibility to the star center remains the same.

Karl-Liebknecht-Strasse

Due to the engineering work on Karl-Liebknecht-Strasse, there are restrictions on the parking lot and the footpath between Rudolf-Breitscheid-Strasse and Karl-Liebknecht-Stadion. Rathaus Babelsberg stop towards Griebnitzsee cannot be served.

Stahnsdorfer Strasse

Due to line works, the Stahnsdorfer Straße / Franz-Mehring-Straße junction area must be completely closed to traffic. Access to Stahnsdorfer Strasse opposite Franz-mehring-Strasse on the August-Bebel-Strasse side is guaranteed.

Read more after the ad

Read more after the ad

Federal road B 273

In order to be able to connect the access road to the new P + R car park at Marquardt train station, preparations are underway at the roundabout with the exit to Fahrland on the B273. Restrictions apply at the side roundabout.

Plantagenstraße / Rudolf-Breitscheid-Strasse

The rainwater and sewage system will be reorganized on Rudolf-Breitscheid-Strasse between Paul-Neumann-Strasse and Reuterstrasse. This requires extensive closures in several construction phases at Rudolf-Breitscheid-Strasse and Paul-Neumann-Strasse.

The intersection of Plantagenstrasse and Rudolf-Breitscheid-Strasse will be completely closed for this purpose. The direction of Plantagenstraße in the direction of Rudolf-Breitscheid-Straße remains unchanged. Traffic will be redirected. The underground railway crossing is closed to car and bicycle traffic.

Ketziner Strasse

Due to the construction of the cycle path and road works, half of Ketziner Strasse and Fahrländer Chaussee must be closed in the Königsweg. Traffic is regulated by a mobile traffic signaling system. The intersection with Königsweg will be closed to car traffic during construction works.

Read more after the ad

Read more after the ad

The Königsweg between Satzkorn and Fahrländer Chaussee is completely closed to car traffic.

WITH MAZOLINE / pede

Leave a Comment